Home
About Us
Company Overview
Milestones
Culture
Corporate Governance
Board and Management
Industry Associations
Contact Us
Our Operations
Investors and Media
Reports
Announcements
Presentations
News
Share Price
Investor Contacts
Latest report to investors
Sustainability
Health, Safety and Environment
People
Communities
Compliance
Responsible Supply Chain
ESG Report
Join Us
People Strategy
Careers
Employee Gallery
Home / Investors and Media / News / [Press] Build smart mines and practice green development
[Press] Build smart mines and practice green development



On July 14, the reporter visited Liaoning Wulong Gold Mining Co., Ltd. The real-time situation of the mining area, such as the unattended weighing station, the online monitoring of the tailings pond, the automatic drainage remote control system, and the underground electric locomotive unmanned driving system, is clear at a glance on the display screen of 5G Intelligent Control Platform.

In recent years, Liaoning Wulong Gold Mining Co., Ltd. has comprehensively accelerated the construction of “smart mines”, eliminated out-of-date production capacity and equipment, and cooperated with China Mobile, Huawei, DFMC, Shenyang Coal Technology Research Institute and other enterprises. It also integrated supporting equipment in 5G and electronic information fields such as IoT, IoV, AI, big data center and cloud computing. Based on 5G industrial customized network, the company strives to build an intelligent industrial model of the whole industry chain starting from management and business.

Since April 24, Liaoning Wulong Gold Mining Co., Ltd. has insisted on coordinating epidemic prevention and control and safe production, implementing detailed prevention and control measures and closed-loop management, and making every effort to ensure the orderly production and operation and the workers’ health and safety.

Advanced planning ensures the orderly supply of production and living materials and the export of products. For epidemic prevention and control, the company actively did a good job in the information reporting and closed-loop transfer of production materials and freight vehicles, and centrally organized the necessary materials for production to enter the factory, ensuring the smooth production. At the same time, it organized the export of gold concentrate powder to ensure the cash flow.

Party committees and governments at all levels in Dandong City, Zhen’an District and Tongxing Town actively coordinated with relevant departments such as the Ministry of Industry and Information Technology and the Emergency Department to help the company handle vehicle permits, ensuring smooth traffic of freight vehicles carrying production materials and other vehicles carrying centrally purchased living materials.

At present, the company’s production and operation, safety production, technical transformation and upgrading, green mine construction and other works are in order. Next, the company will focus on technical transformation and upgrading, and vigorously promote the construction of green mines with ecological environment, scientific mining, efficient resource utilization and digitalized management information, so as to achieve green and high-quality development.

Source: Dandong News




Beijing
A7 Xiaojing, Wanfeng Road, Fengtai District, Beijing,100161, P.R.China
Shanghai
36/F, 21FC, No.8 Century Avenue, Pudong, Shanghai, 200120, P.R.China
Hong Kong
Room 1905, 19th Floor, China Resources Building, 26 Harbour Road, Wanchai, Hong Kong

010-53232323
021-51166830
+852 26233363
IR@cfgold.com

© 2024 Chifeng Jilong Gold Mining Co., Ltd. | All Rights Reserved